Self-build home: Appoint a supplier to design a kit house
Selection.
Kit homes will tend to be procured through a process of research or recommendation, rather than through a competitive selection process. The supplier of the kit house is offering a product and it is the self builder’s responsibility to determine whether the product is likely to suit their needs or not. It is important therefore when purchasing a kit house to visit a similar completed kit house to get a sense of how the building is likely to feel and to assess the quality of workmanship that can be expected.
Other than the style, quality and flexibility of the kit offered by a supplier, it is also important to consider the extent of the service being offered. Some suppliers will simply provide a shell for the self builder to fit out, whilst others might offer a full, turnkey service, even helping to arrange a mortgage.
Depending on the supplier, activities which may be outside the supply contract for a kit house might include:
- Obtaining necessary statutory approvals (such as planning permission and building regulations approval).
- Providing utilities to the site (such as water, electricity, gas, telecoms, drainage and so on).
- Providing a foundation slab.
- Fitting out the interior.
- Landscaping and providing access to the site (this might include; paths, drives, ramps, steps and so on).
The supplier may be able to help with some of these tasks (for example consulting with the local planning authority and obtaining building regulations approvals) or may be able suggest contractors or consultants that can help.
At this stage, any formal appointment should only be for design services, with agreement to purchase the kit house delayed until the design has developed satisfactorily, and a price and programme agreed.
Payment terms will vary depending on the supplier. Sometimes fees are required for design, planning application and building regulations applications as well as stage payments during fabrication and installation. Payments that have been made for design fees are sometimes deducted from the overall price when the main supply contract is signed.
It is important to ensure the kit house comes with a suitable warranty covering design, materials and workmanship, and that any fixtures and fittings are covered as well as the buildings fabric (albeit they may be covered by a separate, shorter-term warranty).
Mortgage lenders are likely to require a warranty before they will lend against the completed building. Warranty providers may wish to inspect the building as construction progresses.
Featured articles and news
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description fron the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.